Commissioning Installation Guide For FRP Pump Stations

Incomplete Controller Installation

  • Conduits not fully installed to the controller.
  • No mechanical protection installed

Complete Controller Installation

  • Conduits fully installed to bottom of controller through gland plate.
  • Mechanical protection installed.
  • Cables pulled through to the controller ready for commissioning

Controller Installation

  • Penetrations through gland plate at the bottom of controller.
  • Cables through to controller ready for connection by All Purpose Pumps technician.

Pit Installation

  • Pumps lowered into pit and coupled to discharge pipework.
  • Cables pulled through conduit.
  • Pit clean and test water available.